Major maintenance manual for Agilent TriScroll 600 Series dry scroll vacuum pumps, covering disassembly, rebuild, tool kits, and safety.
This manual provides information for performing scheduled major maintenance on Agilent TriScroll 600 Series dry scroll vacuum pumps. It covers safety considerations, required equipment, maintenance and tool kits, disassembly, component assembly, final assembly, and factory service options.
The manual includes related TriScroll manuals, exploded views, and reassembly instructions for major pump components. It states that major rebuild time is typically 18,000 hours and that the TriScroll 600 weighs 32 kg (70 lbs).
| Pump weight | 32 kg (70 lbs) |
|---|---|
| Major rebuild interval | typically 18,000 hours |
The time to perform major rebuild is typically 18,000 hours.
The TriScroll 600 weighs 32 kg (70 lbs).
The Maintenance Tool Kit or the Tip Seal Tool Kit is required for tip seal replacement.
Agilent offers factory-rebuild service or advance exchange of complete TriScroll pumps or TriScroll pump modules.