Brocade 6520 Switch QuickStart Guide

This guide describes how to install and set up a Brocade 6520 switch in a single-switch configuration using EZSwitchSetup.


Brocade 6520 Switch QuickStart Guide - cover page
Brand
BROCADE
Category
Network Switches
Document type
Quick Start Guide
Language
English
Pages
24
File format
PDF
File size
3.4 MB
Published
26 November, 2023
Updated
26 November, 2023
MD5 checksum
E4CB23B29E5D955C0A295E38179B505F

About this manual

This QuickStart Guide walks through installing and setting up the Brocade 6520 switch in a single-switch configuration using the EZSwitchSetup utility. It covers the required items (Ethernet and Fibre Channel cables, EZSwitchSetup CD, setup computer, host with an installed HBA, disk array, SFP+ transceivers), powering up and cabling the switch, and recording IP network values such as the fixed IPv4 or IPv6 address, subnet mask, default gateway, and the switch World Wide Name (WWN) located on the switch ID pullout.

The guide then explains installing and starting EZSwitchSetup from CD (Ethernet or serial connection), setting the switch IP address, creating an administrator password, configuring Typical Zoning and device selection, and connecting host and storage devices until all connections display as valid. It is bilingual, with the same content repeated in English and Chinese, and refers readers to the Brocade 6520 Hardware Reference Manual, the Fabric OS Administrator's Guide, and the EZSwitchSetup Administrator's Guide for other setup and configuration options.

What's inside

  • Getting ready
  • Powering up and connecting cables to the switch
  • Installing and starting EZSwitchSetup
  • Setting the switch IP address
  • Setting the switch password
  • Configuring the zones and performing device selection
  • Connecting devices

Specifications

Serial connection bits per second9600
Serial connection databits8
Serial connection paritynone
Serial connection stop bits1
Serial connection flow controlnone

Frequently asked questions

Where is the Brocade switch World Wide Name (WWN) located?

The switch WWN is located on the switch ID pullout.

How long does it take for the power and status LEDs to turn green after connecting power?

The power and status LEDs display amber then green, which can take from one to three minutes.

What serial connection settings are used for direct setup of the Brocade 6520?

Use 9600 bits per second, 8 databits, no parity, 1 stop bit, and no flow control.

How long can it take for a connection to display as valid on the Configure Ports and Connect Devices screen?

It can take up to 15 seconds for the connection to display as a valid connection.

Download PDF (3.4 MB)

More BROCADE Manuals


View all BROCADE manuals →