Dell PowerConnect 5500 Series Getting Started Guide Regulatory Models: PowerConnect 5524, 5524P, 5548, 5548P
This guide explains how to install and run Dell PowerConnect 5500 series switches, covering site preparation, unpacking, rack or flat-surface mounting, and power connections. It also explains how to stack switches with HDMI 10G ports and assign unit IDs.
Configuration sections cover the setup workflow, connecting to the terminal, booting the switch, and using the Dell Easy Setup Wizard for initial settings such as the management IP address, subnet mask, SNMP account, and user account.
| Regulatory models | PowerConnect 5524, 5524P, 5548, 5548P |
|---|---|
| Rack size | 48.26-cm (19-inch) equipment rack |
| Operating temperature | 0 to 45ºC (32 to 113ºF) |
| Operating humidity | 10% to 90%, non-condensing |
| Power input | 100-240 VAC, 50-60 Hz outlet |
| Maximum switches per stack | 8 |
| Stacking ports | Two HDMI 10G ports |
| Flat-surface clearance | 5.08 cm (2 inches) on each side and 12.7 cm (5 inches) at the back |
| Setup Wizard response time | 60 seconds |
| Default SNMP privilege level | Privilege Level 15 |
The guide lists the regulatory models PowerConnect 5524, 5524P, 5548, and 5548P, and states that the instructions are the same for all models.
Up to eight switches are supported per stack. Every stack must have a Master unit and may have a Master Backup unit.
Use the two HDMI 10G ports, connecting the left-hand port of the upper switch to the right-hand port of the switch below it. An optional connection between the bottom and top switches adds bandwidth and redundancy.
The wizard guides you through initial switch configuration, including the management IP address, subnet mask, SNMP account, and user account. You can skip it and configure the switch manually in CLI mode.