Dell™ PowerVault™ ML6000 Getting Started Guide (English)
This document serves as a Getting Started Guide for the Dell PowerVault ML6000 tape library. It covers essential initial setup procedures including rack installation for both 5U and 14U configurations, connecting various cables such as Fibre Channel and Serial Attached SCSI (SAS), and powering on the unit. The guide includes specific warnings regarding safety, grounding, and the removal of the robot restraint assembly before cabling.
| Library Control Module Size | 5U |
|---|---|
| Library Expansion Module Size | 9U |
| Total Library Size (ML6020) | 14U |
All Dell PowerVault ML6000 libraries must be installed in a rack.
You must remove all interior packaging and the orange robot restraint assembly.
No, the front panel power switch is not the main disconnection device.