Fleck 9100 Water Softener Installation and Start-Up Guide

This document is about Fleck 9100 softener installation and startup guide


Fleck 9100 Water Softener Installation and Start-Up Guide - cover page
Brand
Fleck
Category
Other
Document type
Installation Guide
Language
English
Pages
8
File format
PDF
File size
757 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
7678278FEFA10957C615456870C252E9

About this manual

This document serves as a start-up guide for the Fleck 9100 water softener system. It outlines the packing list for various model sizes (1.0 to 2.5 cubic foot) and details pre-installation requirements, such as selecting a suitable location and gathering plumbing parts. The guide emphasizes safety precautions, such as shutting off power to electric water heaters if the main water supply is turned off, and notes that installation typically takes 3 to 5 hours.

What's inside

  • Packing List
  • Pre-Installation
  • Best Practices for Piping & Drain Installation
  • Adding Media & Installation Instructions
  • Attaching the brine tubing
  • Starting the System
  • Programming the Softener
  • Troubleshooting Tank Level

Specifications

Minimum Pressure20 PSI
Maximum Pressure90 PSI
Installation Time3 to 5 hours
First Backwash Duration90 minutes

Frequently asked questions

What type of salt is recommended for the brine tank?

Extra coarse salt works better than pellets.

Can I use regular water softener rock salt?

Yes, it is OK to use any kind of water softening salt.

How long does the first regeneration cycle take?

The first backwash and rinse cycle takes 90 minutes.