Rosemount 485 Annubar Pak-Lok Assembly Quick Start Guide

This document is a quick start guide for Rosemount 485 Annubar ™ Pak-Lok Assembly.


Rosemount 485 Annubar Pak-Lok Assembly Quick Start Guide - cover page
Brand
Rosemount
Document type
Quick Start Guide
Language
English
Pages
28
File format
PDF
File size
4.4 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
87854ACC85017998C8F2D8C931E97C6B

About this manual

The document serves as a quick start guide for the Rosemount 485 Annubar Pak-Lok Assembly. It outlines critical pre-installation considerations regarding pipe straight run requirements to ensure accurate flow measurements based on upstream disturbances and valve types.

The guide details the physical assembly components, including the transmitter, coplanar flange, O-rings, and Pak-Lok body. It provides specific instructions for drilling sensor holes, welding mounting hardware, inserting the Annubar, and mounting the transmitter, along with orientation diagrams for liquid, gas, and steam applications.

What's inside

  • Location and orientation
  • Straight run requirements
  • Exploded view drawings
  • Misalignment limits
  • Flowmeter Orientation (Liquid)
  • Flowmeter Orientation (Gas)
  • Flowmeter Orientation (Steam)

Specifications

Maximum misalignment3°

Frequently asked questions

What is the maximum allowed misalignment during installation?

The Rosemount 485 Annubar installation allows for a maximum misalignment of 3 degrees.

Does this guide cover configuration or troubleshooting?

No, this guide provides basic guidelines only and does not include instructions for configuration, diagnostics, maintenance, service, or troubleshooting.

Download PDF (4.4 MB)

More Rosemount Manuals


View all Rosemount manuals →