This document is a quick start guide for Rosemount 485 Annubar ™ Pak-Lok Assembly.
The document serves as a quick start guide for the Rosemount 485 Annubar Pak-Lok Assembly. It outlines critical pre-installation considerations regarding pipe straight run requirements to ensure accurate flow measurements based on upstream disturbances and valve types.
The guide details the physical assembly components, including the transmitter, coplanar flange, O-rings, and Pak-Lok body. It provides specific instructions for drilling sensor holes, welding mounting hardware, inserting the Annubar, and mounting the transmitter, along with orientation diagrams for liquid, gas, and steam applications.
| Maximum misalignment | 3° |
|---|
The Rosemount 485 Annubar installation allows for a maximum misalignment of 3 degrees.
No, this guide provides basic guidelines only and does not include instructions for configuration, diagnostics, maintenance, service, or troubleshooting.