User manual for Morningstar company TriStar MPPT Solar Charge Controller TS-MPPT-30, TS-MPPT-45 & TS-MPPT-60 models

This is the user manual for Morningstar company TriStar MPPT Solar Charge Controller TS-MPPT-30, TS-MPPT-45 & TS-MPPT-60 models.


User manual for Morningstar company TriStar MPPT Solar Charge Controller TS-MPPT-30, TS-MPPT-45 & TS-MPPT-60 models - cover page
Brand
Morningstar
Document type
Quick Start Guide
Language
English
Pages
4
File format
PDF
File size
1.4 MB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
8061458C97F7A2177AF2C88D36B3272C

About this manual

This document serves as a Quick Start Guide for the Morningstar TriStar MPPT Solar Charge Controller models TS-MPPT-30, TS-MPPT-45, and TS-MPPT-60. It outlines the contents of the box, required tools, and critical safety warnings regarding hazardous voltage and the need for a Ground Fault Disconnect (GFDI) device. The guide specifies that the unit must be installed by a qualified technician in accordance with local electrical regulations.

What's inside

  • Specifications
  • In the Box
  • Tools Required
  • Wiring Terminals
  • Mounting
  • Power Up Sequence
  • DIP Switch Settings
  • Battery Charging Settings

Specifications

Battery Voltage12 Vdc, 24 Vdc, or 48 Vdc
Maximum PV Open Circuit Voltage150 Vdc
Maximum Battery Current (TS-MPPT-30)30 A
Maximum Battery Current (TS-MPPT-45)60 A
Maximum Battery Current (TS-MPPT-60)60 A
Battery Operating Voltage Range8 to 72 V
Nominal Maximum Output Power (TS-MPPT-30)400 Watts
Nominal Maximum Output Power (TS-MPPT-45)800 Watts
Nominal Maximum Output Power (TS-MPPT-60)800 Watts
Battery Types SupportedFlooded, Sealed, AGM, Lithium

Frequently asked questions

What tools are required for installation?

Required tools include a #2 Philips Screwdriver, 3/16 (5 mm) & 1/8" (3.8 mm) Flathead Screwdriver, a Drill with a 1/8" (3.8 mm) bit, and a Multimeter.

Can the TriStar charge controller be installed by a DIY user?

No, the TriStar charge controller must be installed by a qualified technician in accordance with the electrical regulations of the country of installation.

Is a Ground Fault Disconnect (GFDI) device included?

No, the unit is not provided with a GFDI device and must be used with an external GFDI device as required by Article 690 of the National Electrical Code.

What is the power up sequence for the controller?

The power up sequence requires connecting the Battery/Battery Bank first, followed by connecting the Solar array.

Download PDF (1.4 MB)

More Morningstar Manuals


View all Morningstar manuals →