Shimadzu UV-2600 UV Spectrophotometer Operation Manual

The UV-2600 UV spectrophotometer is manufactured by Shimadzu in Japan and is combined with the powerful UVProbe software for easy operation. The main technical parameters include a wavelength range of 185nm to 900nm, a resolution of 0.1nm, and a wavelength accuracy of ±0.3nm. The instrument consists of the UV-2600 UV spectrophotometer and a computer.


Shimadzu UV-2600 UV Spectrophotometer Operation Manual - cover page
Brand
Shimadzu
Category
Other Electronics
Document type
User Manual
Language
Chinese
Pages
15
File format
PDF
File size
1.1 MB
Published
30 November, 2022
Updated
27 September, 2023
Model
UV-2600
MD5 checksum
0288F85D888406E10BD4B30C9FA1A7BC

About this manual

This manual provides operational instructions for the Shimadzu UV-2600 UV Spectrophotometer, a device manufactured by Shimadzu. It details the instrument's overview, technical specifications, and usage conditions, including operating temperature and humidity requirements. This manual is written in Chinese.

What's inside

  • Instrument Overview
  • Technical Specifications
  • Operating Conditions
  • Instrument Structure
  • Startup Procedure
  • Software Connection
  • Measurement Methods
  • Data Saving and Export
  • Troubleshooting
  • Common Faults

Specifications

Wavelength Range185nm~900nm
Resolution0.1nm
Wavelength Accuracy±0.3nm
Stray Light0.005% or less
DetectorPhotomultiplier R-928
Measuring Range-5~5Abs
Cuvette Path Length1cm
Light Source50W Halogen Lamp, Deuterium Lamp
MonochromatorCherny-Turner Monochromator
Operating VoltageAC100V~240V
Operating Frequency50~60Hz

Frequently asked questions

What are the operating temperature and humidity conditions for the UV-2600?

The instrument should be operated at a temperature between 15 and 35°C and a humidity level between 30% and 80%.

How long does the instrument self-check take after startup?

The self-check process takes approximately 5 minutes after the power is turned on.

What is the recommended time for instrument warm-up before baseline correction?

It is recommended to let the instrument warm up for 1 hour after turning it on before performing baseline correction.

What should be done if the instrument fails to initialize?

If initialization fails, close the power supply and check for items blocking the light path in the sample chamber before restarting.

Download PDF (1.1 MB)

More Shimadzu Manuals


View all Shimadzu manuals →