This user's guide provides a reference document for the SRC4382EVM-PDK and SRC4392EVM-PDK product development kits. The kits include either an SRC4382EVM or an SRC4392EVM daughterboard, as well as a DAIMB motherboard. Together, the daughter and mother boards form a modular platform for evaluating the function and performance of the Texas Instruments' SRC4382 and SRC4392 integrated circuits. Applications software is provided with the PDK for writing and reading registers and data buffers integral to the SRC4382 and SRC4392 devices. The software communicates with the device under test using the USB slave interface on the DAIMB board. The software requires a host PC running the Microsoft Windows™ 2000 or XP operating system.
This guide provides a reference for the SRC4382EVM-PDK and SRC4392EVM-PDK product development kits. Each kit includes a daughter‑board EVM, a DAIMB motherboard, a power supply, USB cable, and software for register and buffer access. The document describes absolute operating conditions, hardware configuration, jumper and switch settings, and software installation.
Hardware sections detail power‑supply jumper configurations, SPI/I²C interface selection, clock source selection, and audio serial port settings. Software information explains the required Windows 2000/XP host environment and the provided USB‑based application for register read/write. Safety warnings and warranty notices are also included.