This installation guide introduces the selection and use of ACS-CHK-x3 input/output chokes
This guide provides instructions for the selection, installation, and replacement of input and output chokes for ABB ACS 100/140 frequency converters. Input chokes reduce line current harmonics and protect the diode bridge, while output chokes reduce voltage peaks and protect the motor from long cable effects.
The document details safety warnings, including the requirement for a qualified electrician and a 5-minute discharge time for capacitors before work. It specifies installation requirements such as vertical mounting, natural convection cooling, and specific clearance distances. Technical specifications for the ACS-CHK-A3, ACS-CHK-B3, and ACS-CHK-C3 series are provided, along with circuit diagrams for input and output configurations.
| Enclosure rating | IP20 |
|---|---|
| Maximum cable size | 4 mm2 |
| Insulation class | B |
| Storage temperature | -40 to +70 C |
| Ambient operating temperature | 0 to +40 C |
| Relative humidity | less than 95 % |
| Installation altitude | 0 to 2000 m |
| Maximum wall attachment temperature | +90 C |
| Maximum switching frequency (output) | 4 kHz |
| Maximum output frequency (output) | 100 Hz |
| Maximum motor cable length (output) | 100 m (if supply voltage >= 440 V) |
All electrical installation and maintenance work should be carried out by a qualified electrician.
After switching off the mains, always allow the intermediate circuit capacitors 5 minutes to discharge before commencing work.
No, you should never attempt to repair a broken unit and must contact the supplier for a replacement.
The unit should be installed vertically on a solid non-inflammable surface with 50 mm free space around the enclosure for natural convection cooling.