ABB 1ZCL000001EG Power Transformer Assembly and Energizing Manual

The recommendations, instructions and procedures here contained will give you a guide to accomplish labors of installation or assembly and implementation or energizing of a power transformer. This information is not the only one requirement to the transformer operates satisfactorily. It is required to count firstly on qualified personnel and tools and equipment designed for this purpose.


ABB 1ZCL000001EG Power Transformer Assembly and Energizing Manual - cover page
Brand
ABB
Category
transformers
Document type
User Manual
Language
English
Pages
31
File format
PDF
File size
274 KB
Published
04 May, 2014
Updated
25 September, 2023
MD5 checksum
6638519B4842D94211C0F77E143F9249

About this manual

This manual serves as a guide for the assembly and energizing of ABB 1ZCL000001EG power transformers. It outlines the necessary procedures for installation, including transportation, handling, and storage recommendations to ensure the equipment arrives in good condition. The document emphasizes the need for qualified personnel and appropriate tools to perform these tasks safely and effectively.

The guide details the specific order of assembly, starting with preliminary checks upon arrival, followed by storage requirements if immediate installation is not possible. It covers critical steps such as preliminary and final oil filling under vacuum, the assembly of radiators and expansion tanks, and various field tests including insulation resistance, polarity, and dielectric breakdown tests. Safety procedures and necessary tools are also addressed.

What's inside

  • Objective
  • Description of the Manual
  • The assembly order of the transformer
  • Transportation and arrival at installation site
  • Storage
  • Preliminary fill up with oil
  • Radiators assembly
  • Assembly of the expansion tank
  • Final fill up with oil under vacuum
  • Tests in field

Frequently asked questions

What is the minimum traction resistance required for the cables used to secure the transformer during transport?

Each cable must offer a minimal resistance to traction of 15 tons.

What is the maximum allowable longitudinal slope during the transportation of the transformer?

There should not be any slopes greater than 25° longitudinal during transportation.

What gas and pressure level should be used to check for leaks in the main tank after arrival?

The tank is filled with dried nitrogen gas at approximately 0.2 kg/cm² to 20°C to check for leaks.