Schneider Electric Altivar 320 Variable Speed Drive Safety Functions Manual NVE50467

Schneider Electric Altivar 320 safety functions manual covering STO, SS1, SLS, SMS, GDL, commissioning, technical data, and maintenance.


Schneider Electric Altivar 320 Variable Speed Drive Safety Functions Manual NVE50467 - cover page
Brand
Schneider Electric
Category
inverter
Document type
User Manual
Language
English
Pages
102
File format
PDF
File size
1.6 MB
Published
11 November, 2026
Updated
11 November, 2026
MD5 checksum
1B3279B6A4D51B809DAC1B9AF63270EA

About this manual

This document is the Schneider Electric Altivar 320 Variable Speed Drives Safety Functions Manual, document NVE50467, dated 03/2016. It covers the safety functions STO (Safe Torque Off), SS1 (Safe Stop 1), SLS (Safely-Limited Speed), SMS (Safe Maximum Speed), and GDL (Guard Door Locking).

The manual includes certifications, safety-related parameter calculations, behavior and priority of safety functions, HMI visualization, technical data, certified architectures, commissioning, and services and maintenance. It states that the product is a drive for asynchronous motors intended for industrial use and must be installed outside hazardous areas.

What's inside

  • Safety Information
  • Generalities
  • Description
  • Calculation of Safety Related Parameters
  • Behavior of Safety Functions
  • Safety Functions Visualization by HMI
  • Technical Data
  • Certified Architectures
  • Commissioning
  • Services and Maintenance

Specifications

Motor typeAsynchronous motors
Product surface temperatureMay exceed 80 °C (176 °F) during operation
DC bus voltageCan exceed 800 Vdc
DC bus capacitor discharge wait time15 minutes
DC bus voltage verification threshold<42 Vdc
Hazardous area useOnly outside hazardous areas

Frequently asked questions

What does STO stand for?

STO stands for Safe Torque Off.

What does SLS stand for?

SLS stands for Safely-Limited Speed.

How long should you wait after disconnecting power before working on the drive?

Wait 15 minutes to allow the DC bus capacitors to discharge.

What DC bus voltage threshold should be verified before work?

The voltage on the DC bus should be verified as <42 Vdc.

Download PDF (1.6 MB)

More Schneider Electric Manuals


View all Schneider Electric manuals →