This document provides quick installation instructions for the QNAP WS-411U Turbo Server, including rack mounting, hard drive installation, and initial…
This Quick Installation Guide covers the setup of the QNAP WS-411U Turbo Server. It details how to install the hard disk trays and drives, mount the server into a rack using the provided kit, and connect the necessary cables for power and network. This manual is written in Chinese.
You must install four hard disks into the server.
All disks must be inserted from right to left, labeled HDD1 through HDD4.
Four flat head screws are required to fasten each disk.