PerkinElmer Lambda 20/Lambda 40 UV/Vis Spectrometer Installation and Maintenance Guide

Official installation and maintenance guide for PerkinElmer Lambda 20 and Lambda 40 UV/Vis spectrometers, covering safety, setup, and repair.


PerkinElmer Lambda 20/Lambda 40 UV/Vis Spectrometer Installation and Maintenance Guide - cover page
Brand
PerkinElmer
Category
Other Electronics
Document type
Service Manual
Language
English
Pages
106
File format
PDF
File size
913 KB
Published
06 November, 2026
Updated
06 November, 2026
MD5 checksum
9CF1388BDE1AE086FD200258B38F3223

About this manual

This document serves as the official installation and maintenance guide for the PerkinElmer Lambda 20 and Lambda 40 UV/Vis spectrometers. It provides essential safety information, compliance details, and step-by-step instructions for basic installation, including unpacking, electrical connection, and accessory setup.

What's inside

  • Safety Information
  • Basic Installation
  • System Configuration
  • Accessory Installation
  • Maintenance
  • System Description
  • Technical Data
  • Replacement Parts

Specifications

TypeScanning double-beam spectrometer for the UV/Vis range
Dimensions (Lambda 20)Width: 650 mm, Height: 260 mm, Depth: 560 mm
Mass26 kg approx.
Power requirements100 V to 240 V AC, 50/60 Hz; 250 VA
Ambient operating temperature15 ºC to 35 ºC

Frequently asked questions

Who is authorized to service the instrument?

Servicing should be carried out only by a PerkinElmer service representative or similarly authorized and trained person.

What safety precautions are required before opening the instrument?

The instrument must be disconnected from all voltage sources before opening it for any adjustment, replacement, maintenance, or repair.

What is the pollution degree for the equipment?

The equipment will operate safely in environments up to Pollution Degree 2 as defined in IEC 1010-1 and IEC 664.

Download PDF (913 KB)

More PerkinElmer Manuals


View all PerkinElmer manuals →