Installation, certification, and safety guidelines for Honeywell's Universal Process Cabinet in hazardous locations.
This manual provides installation and safety instructions for the Honeywell Universal Process Cabinet (UPC) in hazardous locations. It covers certification details, configuration limits, environmental ratings, wiring, and grounding requirements. The document includes tables for calculating maximum allowable current and power dissipation based on ambient temperature and installed components. Maintenance procedures and safety warnings are also detailed, including grounding requirements and restrictions for field servicing in hazardous atmospheres.
The UPC is designed to house I/O equipment, power supplies, and field termination assemblies. It supports various configurations including redundant and non-redundant UIO2 and LLAI modules, as well as CN100 controllers. The manual references additional documentation for mounting and detailed service procedures.
| Protective Earth Ground Wire Size | 10AWG minimum |
|---|---|
| Shield Ground Wire Size for IS [ia] | 2-6 AWG for 10mm clamping yokes |
The protective earth ground conductor must be 10AWG minimum.
The UPC allows Series-C Universal I/O-2 and/or LLAI and/or CN100 to be installed in a remote location.
The minimum wire size is 10AWG.