This manual provides installation, configuration, and maintenance instructions for the Hirschmann BAT-R open dual-band industrial access point.
This document serves as the installation and user manual for the Hirschmann BAT-R series of open dual-band industrial access points, clients, and access bridges. It covers safety instructions, device descriptions, and detailed procedures for physical installation, including mounting on DIN rails or flat surfaces, grounding, and connecting antennas and power supplies.
| Product Type | Open Dual-Band Industrial Access-Point / Client / Access-Bridge |
|---|---|
| Supply Voltage C | 24 V DC ... 48 V DC |
| Supply Voltage K | 60 V DC ... 250 V DC / 110 V AC ... 230 V AC |
| Supply Voltage W | 24 V DC |
| Release Version | Release 18 |
The equipment must be operated with a minimum distance of 50 cm (19.7 in) between the antenna and your body.
You must install and operate this equipment with a minimum distance of 50 cm (19.7 in) between the antenna and your body.
The surfaces of the device housing may become hot when the ambient air temperature exceeds +60 °C (+140 °F).
You must ground the device before connecting any other cables.