Installation and maintenance instructions for the Armstrong CV1500 control valve: piping setup, actuator reversal, and diaphragm, O-ring and bushing…
This Chinese-language manual (document 652-EN) covers installation and maintenance of the Armstrong CV1500 control valve. The installation section lists the checks to make before mounting the valve: inspecting for shipping damage, blowing out the piping, verifying the flow-direction marking on the valve body, choosing a straight run of pipe, installing a bypass for maintenance, using proper gaskets on flanged bodies, and fitting an Armstrong Y-type strainer, a separator and a TVS trap station ahead of the valve. It also gives the maximum actuator air pressure and the recommended downstream pipe velocity. This manual is written in Chinese.
| Maximum actuator air pressure | 0.4 MPa (60 psig) |
|---|---|
| Maximum downstream pipe flow velocity after enlargement | 8000 ft/min |
| Recommended upstream strainer | Armstrong Y-type strainer with 100 mesh screen |
| Safety relief valve setting | 10 psi or 10% higher than downstream pressure, whichever is greater |
| Valve body parts, item 8 | Packing assembly, quantity 15 |
The maximum actuator air pressure is 0.4 MPa (60 psig). A filter should be installed in the air line to the actuator or positioner.
Yes, it can be installed in any direction, but the best arrangement is horizontal piping with the actuator in a vertical position.
The manual's section B gives the disassembly and reassembly steps for converting a reverse-acting (air-to-close) actuator without handwheel to positive-acting (air-to-open), including moving the vent plug to the lower cover and using the upper cover opening as the air inlet.
An Armstrong Y-type strainer with a 100-mesh screen should be installed before the control valve so dirt does not affect its operation.