Armstrong Large Format Ceiling Panel Installation Guide

Installation instructions for large format mineral fiber and fiberglass ceiling panels in 9/16" or 15/16" suspension systems, covering design…


Armstrong Large Format Ceiling Panel Installation Guide - cover page
Brand
Armstrong
Category
Other
Document type
Installation Guide
Language
English
Pages
3
File format
PDF
File size
277 KB
Published
11 November, 2026
Updated
11 November, 2026
MD5 checksum
1AA08C0FE5774F67946F156BDCEE2268

About this manual

This document provides installation requirements for large format mineral fiber and fiberglass ceiling panels installed in 9/16" or 15/16" suspension systems. It applies to panels with square lay-in or tegular edge details and addresses specific considerations for panels equal to or greater than 5 feet in length to ensure system integrity.

What's inside

  • Product Description
  • Design and Installation Considerations
  • Accessories
  • Suspension System
  • Perimeter Treatment
  • Special Considerations for Long Panels
  • Seismic Considerations

Specifications

Applicable Suspension Systems9/16" or 15/16"
Panel Thickness (Stabilizer Clip 435)3/4" to 1"
Panel Thickness (Stabilizer Clip 436)1-1/2" to 1-3/4"
Minimum Clearance for 2' Wide Panels3"
Minimum Clearance for 4' Wide Panels8"

Frequently asked questions

When are Stabilizer Clips required?

Stabilizer Clips are required when the length of grid between lateral supports is greater than 5'.

How many Stabilizer Clips are needed for grids greater than 8'?

Two Stabilizer Clips must be installed at one-third points of the panel.

What is the recommended paint for field-cut tegular edges?

Armstrong SuperCoat Ceiling Panel Touch-up Paint is recommended for exposed cut edges.

Download PDF (277 KB)

More Armstrong Manuals


View all Armstrong manuals →