This document outlines the site preparation requirements, including space, environmental conditions, power, and gas specifications, for installing the…
This document serves as a checklist and information guide for preparing the installation site for the Agilent 5977 Series MSD. It details customer responsibilities regarding laboratory space, environmental conditions, power requirements, and necessary operating supplies to ensure reliable instrument operation. This manual is written in Chinese.
| Recommended Venting Tubing Length | 6 meter (20ft.) |
|---|
The laboratory bench must be at least 54 cm (21.5”) deep to support the instrument and base.
The optimal carrier gas flow is 1.0 – 1.5 ml/min, with a maximum recommended flow of 2.0 ml/min.
A 1/2 inch i.d. PVC/vinyl tubing is recommended for venting the foreline pump exhaust.