Yokogawa Portable Indicator Meter User Manual

This document mainly introduces a portable indicator, including DC ammeters, AC ammeters, pointer frequency meters, high frequency ammeters, power factor meters, power meters, small portable ammeters and voltmeters, as well as other auxiliary equipment. The document also emphasizes the limitations of use environment and conditions, as well as the precautions for connection and maintenance.


Yokogawa Portable Indicator Meter User Manual - cover page
Brand
YOKOGAWA
Category
Other device
Document type
User Manual
Language
Japanese
Pages
16
File format
PDF
File size
657 KB
Published
29 October, 2011
Updated
29 September, 2023
MD5 checksum
82F7774CCBD400B25D5BDF90DDCAE431

About this manual

The manual begins with safety precautions, describing the temperature (0‑40 °C), humidity (25‑80 %RH) limits and handling rules such as avoiding vibration, shock and static electricity. It also explains wiring, connection to CTs, and required torque for terminals.

It then lists the full product range – portable current/voltage meters, high‑frequency meters, audible‑frequency voltage meters, frequency meters, power‑factor meters and related accessories – together with their measurement ranges, dimensions, weight and accuracy classes. This manual is written in Japanese.

What's inside

  • Safety Precautions
  • Selection Guide
  • Portable Indicator Meter Models
  • High‑Frequency Current/Voltage Meters
  • Frequency Meters
  • Power‑Factor Meters
  • Instrument Transformers & Shunt Resistors
  • Accessories & Spare‑Parts Price List
  • Q&A

Specifications

Operating temperature range0 °C to 40 °C
Operating humidity range25 %RH to 80 %RH
Frequency measurement range (2016 model)DC 10 Hz – 5 MHz
Frequency measurement range (2038 model)45 Hz – 500 Hz

Frequently asked questions

Can the portable meter be used in a vertical position?

No. The meter must be used in a horizontal (standard) position; vertical use can cause large indication errors.

Are measurement lead wires supplied with the meter?

No. Lead wires are not provided; the customer must supply appropriate leads.

Download PDF (657 KB)

More YOKOGAWA Manuals


View all YOKOGAWA manuals →