The Dell™ PowerVault™ ML6000 Getting Started Guide provides information about how to set up and use the Dell™ PowerVault™ ML6000.
This document serves as the Getting Started Guide for the Dell PowerVault ML6000 tape library. It outlines the initial steps required to prepare the library for operation, including unpacking and removing safety restraints. The guide directs users to the Dell PowerVault ML6000 Tape Library User's Guide for detailed rack installation procedures, noting that the ML6000 library must be installed in a rack with a main protective earthing terminal.
The guide covers essential cabling tasks, such as connecting Fibre Channel cables to a host or switch, connecting Serial Attached SCSI (SAS) cables, and finishing the cabling process using module terminators. It also details the procedure for powering on the library, which involves turning on individual power supplies and the main power switch, followed by running the Setup Wizard to configure the system and verify host communication.
All libraries must be installed in a rack having a main protective earthing (grounding) terminal.
It consists of one ML6010 CM 5U Library Control Module and one ML6000 EM 9U Library Expansion Module, for 14U total.
The yellow strip in the I/E station must be removed.
Read the Dell PowerVault Systems safety instructions in the Safety, Environmental and Regulatory Information guide.