Dell 10Gb Ethernet Pass Through -k for M1000e Software User’s Manual Rev 1.00
This manual provides instructions for using the Dell 10Gb Ethernet Pass Through -k software on the M1000e platform. It covers connecting to the CLI, managing port groups and link states, troubleshooting common issues, and updating firmware. The document includes detailed command references and step-by-step procedures for software updates and recovery operations.
The 10GbE PTM has 16 front panel ports divided into two groups, with LEDs indicating link status and system health. It supports 10GBase KR protocol and reflects uplink status to server blades. Link protocol mismatches and power issues are addressed with specific CLI commands and recovery steps.
Green LED off indicates link down or module not present; amber LED blinking indicates a fault; both lit indicate the module is ready.
This manual describes the installation and basic use of the Dell 10Gb Ethernet Pass Through -k for M1000e.
The supported link protocol for all internal ports is 10GBase KR.
At least 20 seconds must have passed since the last power cycle of the 10GbE PTM module before running the connect command.