Moeller AWB0207+9119-1406 Explosion-Proof Three-Phase Motor Repair Instructions

This document describes the repair instructions for the AWB0207+9119-1406 explosion-proof three-phase motor.


Moeller AWB0207+9119-1406 Explosion-Proof Three-Phase Motor Repair Instructions - cover page
Brand
Moeller
Category
Explosion Proof Motors
Document type
Service Manual
Language
English
Pages
28
File format
PDF
File size
1.4 MB
Published
11 November, 2023
Updated
11 November, 2023
MD5 checksum
3F6A314BD11904390FA32640DA4A3693

About this manual

This Moeller document (AWB0207+9119-1406) gives safety and repair instructions for explosion-proof three-phase motors in flameproof enclosures, designation Ex II 2.EEx d(e) IIC(B) T. It states that the manual covers the disassembly and assembly of CD.../BD... and dCD.../dBD... explosion-proof motors and must be used in addition to the general installation instructions, the operating manual and the relevant explosion protection standards such as EN 60079-14 and EN 50281-1-2.

The manual opens with the safety measures required before repair work, then covers explosion protection (gap connections and shaft bushings, fastening screws, seals, cable glands, terminal points and approval after repair), maintenance instructions, the mechanical design with a spare parts list, disassembly and assembly by frame size, terminal box and flameproof cable glands, brake and tacho-generator work, ventilation, and the tests required before recommissioning.

What's inside

  • About This Manual
  • Explosion Protection
  • Maintenance Instructions
  • Mechanical Design
  • Spare parts
  • Disassembly
  • Assembly
  • Tests

Specifications

Protection type designationEx II 2.EEx d(e) IIC(B) T
Maximum average peak-to-valley height of gap surfacesRa = 6.3 µm (ISO 468)
Frame size range for end shields, rotors and roller bearings56 to 225 and from 250
Minimum ambient temperature for supplied lifting eye bolts–20 °C
Maximum load angle for lifting eye bolts45° from the vertical

Frequently asked questions

Who may work on this explosion-proof motor?

Only suitably qualified personnel in accordance with EN 50110-1/-2 (VDE 0105 Part 100). All transport, installation, commissioning and maintenance activities must be carried out by qualified personnel.

What safety steps are required before starting repair work?

Disconnect the power supply, make sure the device cannot be accidentally restarted, verify isolation, earth and short-circuit, and cover or enclose neighbouring units that are live.

How must gap surfaces be treated?

Gap surfaces must not be machined, coated or painted, and the surface metal must be kept clean and free of damage such as fractures or grooves.

What is required after repair work before recommissioning?

An appointed inspector must verify that the essential explosion protection features meet the applicable regulations and issue certification, and the tests in the Tests chapter must be carried out first.

Download PDF (1.4 MB)

More Moeller Manuals


View all Moeller manuals →