Top TP-AD-04 Digestion Furnace Operation Manual

The TP-AD-04 digestion furnace adopts a quartz tube infrared heating digestion method, which is characterized by a large digestion heating area, small temperature difference, fast temperature rise, good sample digestion consistency and high thermal efficiency.


Top TP-AD-04 Digestion Furnace Operation Manual - cover page
Brand
Top
Category
Other
Document type
User Manual
Language
Chinese
Pages
3
File format
PDF
File size
139 KB
Published
08 November, 2023
Updated
08 November, 2023
MD5 checksum
8212CBB17353C8B9DFA1CE9E4ECC497C

About this manual

The TP-AD-04 digestion furnace from Zhejiang Top Instrument is used to shorten sample digestion time when determining protein content. It heats by quartz tube infrared radiation, which the manual describes as giving a large heated area, small temperature differences, fast warm-up, consistent digestion and high thermal efficiency, and it is stated to meet the CE standard. A smart microcontroller controls the heating process, so after the heating mode, the three temperature stages and the heating times are set, digestion runs automatically without an attendant. Harmful gases such as SO2 leaving the digestion tubes are drawn off through the collection tube on the furnace by a suction pump and discharged with water into the drain.

The manual explains how the suction pump is connected to the tap and the drain collection tube, the functions of the panel keys, how the heating stages and temperatures are set, and the step-by-step operating procedure. It also lists precautions on gas leakage, the water supply and cooling, and gives the accessory list supplied with the instrument. This manual is written in Chinese.

What's inside

  • Suction pump connection
  • Temperature control method
  • Keypad key functions
  • Heating stage setting
  • Temperature setting
  • Operating procedure
  • Precautions
  • Accessory list

Specifications

Heating methodQuartz tube infrared heating
Number of temperature stages3 (T1, T2, T3)
Recommended stage settingsT1 280 °C for 20 min; T2 450 °C for 60–90 min; T3 350 °C for 0 min
Water flow rate for suction pump3–4 L per minute
Typical digestion time1.5–2 hours from power-on to complete digestion
Cooling time before switching off30 minutes after digestion completes
StandardCE

Frequently asked questions

How long does the TP-AD-04 take to complete digestion?

A typical run takes 1.5 to 2 hours from switch-on to complete digestion.

Can the furnace run with fewer than three temperature stages?

Yes; a stage that is not needed has its heating time set to 0.

When can the power be switched off after digestion?

The instrument must cool for 30 minutes after digestion before the power is turned off.

Download PDF (139 KB)

More Top Manuals


View all Top manuals →