Moeller MODAQO-M Low Voltage Intelligent Distribution System Installation and Use Manual

This manual introduces the installation, operation, maintenance and maintenance methods of MODAQO-M low-voltage intelligent distribution system.


Moeller MODAQO-M Low Voltage Intelligent Distribution System Installation and Use Manual - cover page
Brand
Moeller
Document type
User Manual
Language
Chinese
Pages
18
File format
PDF
File size
1.1 MB
Published
30 October, 2023
Updated
30 October, 2023
MD5 checksum
1A60CB69DFDDBB05ED193578FBF49289

About this manual

Moeller MODAQO-M is a low-voltage intelligent distribution system that can be used as a distribution center, motor control center, or power and lighting control system. The manual covers receiving inspection, transport, storage, installation, cable connection, cleaning, commissioning, operation, maintenance, warranty, and service.

The system is intended for indoor installation in clean, dry, well-ventilated locations. It has passed national compulsory 3C certification and has a service life of more than thirty years. This manual is written in Chinese.

What's inside

  • Receiving inspection
  • Transport and storage
  • Installation
  • Cable connection
  • Commissioning
  • Operation
  • Maintenance
  • Warranty and service

Specifications

Short-term maximum ambient temperature+40 °C
24-hour maximum average ambient temperature+35 °C
Relative humidity at 40 °CNot more than 50%
Altitude deratingDerating above 2000 m
Seismic intensityNot higher than 8°
Minimum insulation resistance0.5 MΩ
Dielectric test voltage2000 V

Frequently asked questions

What should be checked after the equipment arrives?

Check the delivery against the shipping list for completeness and inspect for transport damage; photograph any damage and report it promptly.

What is the minimum insulation resistance during commissioning?

The minimum insulation resistance is 0.5 MΩ.

What dielectric test voltage is required?

Electrical components must withstand 2000 V before entering the grid.

How often should the equipment be maintained?

Newly commissioned equipment should be maintained after one year, then every two to five years depending on the environment.