Agilent Flapper Box Installation Kit for VS Series Leak Detectors Manual

This is a field installation instruction for Agilent Flapper Box Installation Kit for VS Series Leak Detectors


Agilent Flapper Box Installation Kit for VS Series Leak Detectors Manual - cover page
Brand
Agilent
Document type
Installation Guide
Language
English
Pages
10
File format
PDF
File size
1.2 MB
Published
07 June, 2012
Updated
30 September, 2023
MD5 checksum
87F20B2F1AC1618343A8F30434AC80D4

About this manual

This document provides field installation instructions for the Flapper Box Installation Kit, specifically Part Number 699910006 Revision A. It is intended for use with Agilent Technologies VS Series Leak Detectors and requires CPU software version LD02.11 or greater to operate.

The guide details safety precautions regarding solvents, O-ring care, and metal seal handling. It outlines a step-by-step installation procedure involving the removal of covers, disconnection of the I/O board, connection of the Flapper Box wire harness, and final assembly verification.

What's inside

  • Hazard and Safety Information
  • Solvents
  • O-ring Care
  • Metal Seal Care
  • Equipment Required
  • Installation Procedure
  • Flapper Box Wiring Harness Layout

Frequently asked questions

What software version is required to operate the Flapper Box?

The leak detector must have CPU software LD02.11 or greater installed.

Which solvents are recommended for cleaning spectrometer components?

Varian recommends using VacuSolv solvent, isopropyl alcohol (IPA), or Dow Corning OS-20.

What should be done if the system fails to reach System Ready mode?

Refer to the operator's manual for troubleshooting steps.

Download PDF (1.2 MB)

More Agilent Manuals


View all Agilent manuals →