This letter is attached to the DRV603EVM DirectPathTM evaluation module (EVM) package. It provides information about the materials included in the EVM package and reminds users to read the user guide and important notices before setup and use. The evaluation module features the DRV603 chip and is designed for high-end performance amplifiers and audio systems.
This letter is included with the DRV603EVM DirectPath™ evaluation module and lists the items in the package, including the evaluation board, a user guide, and a PurePath CD-ROM with data manuals and test files. It emphasizes the need to read the DRV603EVM Users Guide before setup and notes the maximum power‑supply voltage of 8.0 VDC.
The document also contains legal notices from Texas Instruments regarding warranty, liability, and restrictions on use in safety‑critical, military, aerospace, and automotive applications. Contact information for Texas Instruments and a reminder to verify the latest product information are provided.
| Maximum Power Supply Voltage | 8.0 VDC |
|---|
The DRV603EVM Users Guide should be read before setup and use of the evaluation module.
The maximum power‑supply voltage is 8.0 VDC.