Haier KR-80W (BP) Commercial Air Conditioner Installation Manual


Haier KR-80W (BP) Commercial Air Conditioner Installation Manual - cover page
Brand
Haier
Category
Air conditioner
Document type
Installation Guide
Language
Chinese
Pages
24
File format
PDF
File size
21.7 MB
Published
19 March, 2012
Updated
19 April, 2012
MD5 checksum
F07556B0AEB6FCB428379EE746198DE2

About this manual

This guide provides the required safety precautions, grounding instructions, and recommended installation locations for the Haier KR-80W (BP) commercial air‑conditioner. It also details the handling of refrigerant lines, pipe sizing, and torque specifications for connections.

The manual includes step‑by‑step procedures for moving, mounting, and connecting the outdoor unit, as well as tables of technical specifications such as cooling capacity, power consumption, and noise levels. This manual is written in Chinese.

What's inside

  • User Notice
  • Safety Precautions
  • Installation Procedure
  • Full Precautions
  • Installation Position Selection
  • Piping Material Selection
  • Refrigerant Piping Connection
  • Technical Specifications

Specifications

Cooling capacity8000W
Power supply1PH, 220V, 50Hz

Frequently asked questions

How long must the unit be powered before first operation?

The outdoor unit should be powered for at least 12 hours before starting to protect the compressor.

What grounding requirements are required for installation?

Effective grounding is mandatory and the ground wire must not be connected to gas pipes, water pipes, lightning rods, or telephone lines.

Can the outdoor unit be installed on a non‑metal frame?

No, the unit must be installed on a dedicated metal frame; installing on non‑metal structures can cause the unit to fall and cause injury.

What refrigerant is used in this air‑conditioner?

The system uses refrigerant R‑22 (IR22).

Download PDF (21.7 MB)

More Haier Manuals


View all Haier manuals →