Hisense KFR-26GW/19FZBp-2 KFR-35GW/19FZBp-2 Split Heat Pump Air Conditioner Installation Manual

This document introduces the features and characteristics of HiSense air conditioners, including 24-hour timer switch, ultra-quiet operation, microcomputer control, automatic control of air direction, automatic and 3-level wind speed, and strong dehumidification.


Hisense KFR-26GW/19FZBp-2 KFR-35GW/19FZBp-2 Split Heat Pump Air Conditioner Installation Manual - cover page
Brand
Hisense
Category
Air conditioner
Document type
Installation Guide
Language
Chinese
Pages
25
File format
PDF
File size
3.5 MB
Published
15 March, 2012
Updated
29 September, 2023
MD5 checksum
80D56608817067C118A06B942E43CD32

About this manual

The manual explains the components of the split heat‑pump system, safety precautions, and operating basics. It includes warnings about electrical grounding, leakage protection, and fire hazards, and describes the indoor and outdoor unit functions, refrigerant cycle, and user controls.

Detailed installation instructions cover site preparation, mounting, refrigerant piping, electrical wiring, and post‑installation testing. The guide also provides troubleshooting tips, maintenance and cleaning procedures, and a summary of the main technical specifications for both models. This manual is written in Chinese.

What's inside

  • Product Features
  • Safety Precautions
  • Air Conditioner Components
  • Operation Guide
  • Maintenance and Cleaning
  • Troubleshooting
  • Refrigerant Cycle Diagram
  • Product Installation Instructions
  • Product Main Specifications

Specifications

Model numberKFR-26GW/19FZBp-2 / KFR-35GW/19FZBp-2
Power supply voltageAC 220 V, 50 Hz
Cooling capacity (min / max)26 kW / 35 kW
Heating capacity (min / max)36 kW / 44 kW
Operating temperature range (heat‑pump mode)-7 °C to 43 °C

Frequently asked questions

What safety precautions must be taken before installing the Hisense split air conditioner?

The installation site must have reliable electrical grounding, independent leakage‑protection and overload‑protection devices, and be kept away from flammable or explosive materials. Proper protective gear and safe handling of refrigerant lines are required.

What is the recommended method for testing the system after installation?

Perform a vacuum extraction for at least 10 minutes, check the pressure gauge until the reading reaches the required level, then verify there are no leaks before powering the unit.

Download PDF (3.5 MB)

More Hisense Manuals


View all Hisense manuals →