Sun Netra 240 Server Installation Guide

This document provides the installation guide for the Netra™ 240 server by Sun Microsystems, Inc. It includes information about the server's components, configuration, included items, and software support.


Sun Netra 240 Server Installation Guide - cover page
Brand
Sun Microsystems
Category
SERVER
Document type
Installation Guide
Language
English
Pages
124
File format
PDF
File size
4.7 MB
Published
16 December, 2011
Updated
29 September, 2023
MD5 checksum
65720E0966823C7A89CD965C86472397

About this manual

This guide explains how to install and configure the Sun Netra 240 server. It covers rack‑mount options, optional components, cable wiring, power connections, and console access, as well as environmental and safety requirements.

Key sections include installation overview, rack‑mount procedures for various chassis sizes, detailed wiring diagrams for data, power, and management ports, power‑supply specifications, and initial system configuration using the Advanced Lights Out Manager (ALOM) and terminal server access.

What's inside

  • Installation Overview
  • Rack‑Mount Installation Options
  • Air Filter Installation
  • Data Cable Connections
  • Power Requirements and Connections
  • Console Device Setup
  • Server Power‑On and Configuration
  • Environmental Requirements
  • Advanced Lights Out Manager (ALOM)
  • Index

Specifications

Operating temperature (DC server)5°C to 40°C (41°F to 104°F)
Short‑term temperature range (DC server)-5°C to 55°C (-23°F to 131°F)
Relative humidity (DC server)5% to 85% (no condensation)
DC input voltage range-40 VDC to -75 VDC
Maximum DC input current< 15 A
Maximum DC input power570 W
AC input voltage range90 V to 264 V AC
Maximum AC input power550 W

Frequently asked questions

What are the operating temperature limits for the Netra 240 server?

The server can operate from 5 °C (41 °F) up to 40 °C (104 °F), with a short‑term range of –5 °C to 55 °C.

What are the DC power input requirements for the Netra 240 server?

The DC version requires an input voltage between –40 VDC and –75 VDC, a maximum current below 15 A, and a maximum power of 570 W.

How can I access the server console through a terminal server?

Connect the server to a terminal server and use the provided console access procedures described in the "Setup System Console Device" section.

What should be done before the first power‑on of the Netra 240?

After receipt, place the server in its installation environment and allow it to sit for 24 hours before powering on to avoid thermal shock and condensation.