Error codeh999
Total input energy exceeds 999.99 kWh or total output energy exceeds 999.99 kWh. The manual's first action is: “When power is off or the CKWH input terminal is active or displayed, press and hold the key for 3 seconds or longer.”
- Model
- Schneider Electric ATV212
- Display shows
- [Pin&1MWh] Total input power (h999)
- Type
- Error code
- Source
- Manual p. 156
What h999 means
[Pin&1MWh] Total input power p. 156
Common causes
What to do
- When power is off or the CKWH input terminal is active or displayed, press and hold the key for 3 seconds or longer. p. 156
- When power is off or the CKWH input terminal is active or displayed, press and hold the key for 3 seconds or longer. p. 156
Before you service the product, read the safety instructions in the manual p. 5.
If h999 is still not resolved
- 与当地的 Schneider Electric 代表联系 p. 7 “如果直流总线电容未完全放电,请与当地的 Schneider Electric 代表联系”
This page summarises what the manufacturer’s manual says about h999; each statement links to the page it comes from, and quoted lines are copied word for word. It is not a substitute for the manual or for a qualified installer. ManualLib is not affiliated with Schneider Electric. Found a mistake? Report an error.
