Wuhan Hezhong NYT-B Insulation Boot (Glove) Dielectric Tester User Manual

The manual provides overview, specifications, operation steps, safety precautions, and maintenance for the Wuhan Hezhong NYT‑B insulation boot (glove)…


Wuhan Hezhong NYT-B Insulation Boot (Glove) Dielectric Tester User Manual - cover page
Brand
Wuhan市合众电气设备制造
Category
Industrial Supply
Document type
User Manual
Language
Chinese
Pages
15
File format
PDF
File size
374 KB
Updated
06 October, 2026
MD5 checksum
78A57727CB63660EBC1B1DA74F82C06E

About this manual

This document describes the NYT‑B dielectric tester designed for batch testing of insulation boots and gloves, as well as other safety tools such as insulated rods and screwdrivers. It outlines the device’s main features, technical specifications, and user interface, emphasizing its micro‑electronic processing and fully Chinese LCD display.

The manual guides operators through parameter setting, testing procedures, safety requirements, troubleshooting, transportation, storage, and routine maintenance, ensuring reliable and safe operation of the equipment in compliance with relevant technical regulations. This manual is written in Chinese.

What's inside

  • Overview
  • Related Technical Regulations
  • Main Features
  • Technical Specifications
  • Keyboard Description
  • Button Operation
  • Parameter Description
  • Parameter Setting
  • Operation Instructions
  • Operating Conditions

Specifications

Rated Output Voltage30 kV
Rated Capacity3 kVA
Output Voltage Range0‑30 kV (250 V)
Voltage Measurement Error< 0.5 % ± 1 digit
Input Current Range0‑13.6 A
Current Measurement Error< 0.5 % ± 1 digit
Leakage Current Range0‑20 mA
Leakage Current Measurement Error< 1 % ± 1 digit
Leakage Current Resolution0.1 mA

Frequently asked questions

What is the rated output voltage of the tester?

The tester’s rated output voltage is 30 kV.

What temperature range can the equipment operate in?

It can be used in ambient temperatures from 0 °C to 40 °C.

How often must the equipment be inspected?

Inspection is required every six months.

What safety distance is required during testing?

Operators must stay at least one meter away, with the electric field below 20 kV per meter.

Download PDF (374 KB)

More Wuhan市合众电气设备制造 Manuals


View all Wuhan市合众电气设备制造 manuals →