Application manual for Sikafloor® Marine-VEM-steel-vertical-stud-bolt system, covering installation steps, safety, and technical specs.
This manual provides step-by-step instructions for installing the Sikafloor® Marine-VEM-steel-vertical-stud-bolt system. It covers substrate preparation, stud bolt welding, primer application, and mortar installation. Safety precautions and environmental conditions are specified, including temperature and humidity limits. The document also includes material consumption guidelines and curing times.
The system is designed for marine applications and requires trained professionals. It specifies compatible substrates, primers, and tools, and includes important notes on avoiding welding seams and using manual tools for tightening nuts.
| Temperature Range | 5 °C to 30 °C |
|---|---|
| Relative Humidity Limit | Below 80 % |
| Curing Time | At least 12 hours |
Only trained professional applicators and contractors may perform the application.
Relative humidity must be below 80%.
Apply SikaCor® ZP Primer prior to any application.
The application must cure for at least 12 hours.