Sika Marine-VEM-steel-vertical-stud-bolt Application Manual

Application manual for Sikafloor® Marine-VEM-steel-vertical-stud-bolt system, covering installation steps, safety, and technical specs.


Sika Marine-VEM-steel-vertical-stud-bolt Application Manual - cover page
Brand
SIKA
Document type
User Manual
Language
English
Pages
6
File format
PDF
File size
1.3 MB
Published
06 November, 2026
Updated
06 November, 2026
MD5 checksum
175EFB809E661317AA13927CB00BB21F

About this manual

This manual provides step-by-step instructions for installing the Sikafloor® Marine-VEM-steel-vertical-stud-bolt system. It covers substrate preparation, stud bolt welding, primer application, and mortar installation. Safety precautions and environmental conditions are specified, including temperature and humidity limits. The document also includes material consumption guidelines and curing times.

The system is designed for marine applications and requires trained professionals. It specifies compatible substrates, primers, and tools, and includes important notes on avoiding welding seams and using manual tools for tightening nuts.

What's inside

  • Application Steps
  • Requirements (Preconditions and Actions)
  • System Build Up / Coverage
  • Additional Information
  • Health and Safety Equipment

Specifications

Temperature Range5 °C to 30 °C
Relative Humidity LimitBelow 80 %
Curing TimeAt least 12 hours

Frequently asked questions

Who can apply this product?

Only trained professional applicators and contractors may perform the application.

What is the maximum relative humidity for application?

Relative humidity must be below 80%.

What primer is required for zinc-rich primed metal or bare aluminum?

Apply SikaCor® ZP Primer prior to any application.

How long should the application cure?

The application must cure for at least 12 hours.

Download PDF (1.3 MB)

More SIKA Manuals


View all SIKA manuals →