Installation checklist excerpt for the Siemens SINAMICS G150 cabinet unit covering mechanical and electrical installation steps.
This document is an excerpt from the operating instructions for the Siemens SINAMICS G150 cabinet unit and provides checklists for mechanical and electrical installation.
It lists installation tasks such as checking transport indicators, environmental conditions, mounting, cable connections, shielding, and option-specific steps, with references to relevant manual chapters. This manual is written in German.
| Cable terminal tightening torque | 50 Nm |
|---|---|
| External auxiliary drive maximum load current | 10 A |
| Cabinet standby heater supply | 230 V / 50 Hz, 100 W |
| Cabinet lighting service socket plant-side protection | max. 10 A |
| Main switch with fuses rating range | up to 800 A (single units) / up to 1380 A (parallel units) |
| Circuit breaker trip current adjustment threshold | over 800 A (single units) / over 1380 A (parallel units) |
| du/dt filter selection parameter | p0230 = 2 |
| Sinus filter selection parameter | p0230 = 3 |
The transport indicators must be checked before mounting.
Power cables must be connected with a torque of 50 Nm.
Capacitor forming is required if the standstill period exceeds 2 years.
The load current may be at most 10 A.