Siemens SIMATIC PCS 7 FOUNDATION Fieldbus Process Control System Commissioning Manual

Siemens SIMATIC PCS 7 FOUNDATION Fieldbus commissioning manual covers planning, engineering, startup, diagnostics, redundancy, and plant changes.


Siemens SIMATIC PCS 7 FOUNDATION Fieldbus Process Control System Commissioning Manual - cover page
Brand
Siemens
Category
Automation control Equipment
Document type
Installation Guide
Language
German
Pages
70
File format
PDF
File size
321 KB
Published
22 November, 2026
Updated
22 November, 2026
MD5 checksum
0C77CC8661C22E6A8C69416EFFE403D6

About this manual

This Siemens SIMATIC PCS 7 FOUNDATION Fieldbus commissioning manual is valid for the Process Control System software package SIMATIC PCS 7 from V9.0 SP1, including SIMATIC PDM V9.1. It covers security notes, fundamentals of FOUNDATION Fieldbus, system planning, engineering, commissioning, redundancy, and plant changes during operation.

The manual explains integration of field devices on FOUNDATION Fieldbus H1 through a Bus Link on PROFIBUS DP, typically the Compact FF Link. It describes EDD integration, device addresses, the device parameter block model, capability levels, bus parameters, macrocycle planning, loading objects, diagnostics, and identification of FF devices with SIMATIC PDM. This manual is written in German.

What's inside

  • Security Notes
  • Introduction
  • Fundamentals of FOUNDATION Fieldbus
  • System Planning
  • Engineering
  • Commissioning
  • Redundancy and Plant Changes During Operation

Specifications

Software package validityProcess Control System; SIMATIC PCS 7 from V9.0 SP1, including SIMATIC PDM V9.1
Fieldbus typeFOUNDATION Fieldbus H1 (FF)
Bus link communicationPROFIBUS DP to FOUNDATION Fieldbus
Bus link moduleCompact FF Link (IM 655-5 FF)
RedundancyCompact FF Link can be configured redundantly

Frequently asked questions

Which software versions does this manual apply to?

It applies to the Process Control System software package SIMATIC PCS 7 from V9.0 SP1, including SIMATIC PDM V9.1.

Which Bus Link is described for communication between PROFIBUS DP and FOUNDATION Fieldbus?

The Compact FF Link (IM 655-5 FF) is the Bus Link described for this connection.

Does SIMATIC PCS 7 support central engineering without additional tools?

Yes. The manual lists central engineering without additional tools as a supported function.

Can the Compact FF Link be configured redundantly?

Yes. The manual states that the Compact FF Link can be set up redundantly.

Download PDF (321 KB)

More Siemens Manuals


View all Siemens manuals →