Installation checklist for the Siemens SINAMICS G150HP cabinet device, covering mechanical and electrical installation steps.
This document is a checklist for the mechanical and electrical installation of the Siemens SINAMICS G150HP cabinet device. It is an excerpt from the operating manual and lists installation steps to be checked off.
It covers power and signal connections, transport-unit connections, EMC shielding, fan transformer voltage adaptation, and optional equipment such as du/dt filters, external auxiliaries, cabinet lighting, standstill heating, auxiliary power supply, customer terminal strip, and SMC30 sensor modules. This manual is written in German.
| Power cable tightening torque | 50 Nm |
|---|---|
| External auxiliary drive load current | max. 10 A |
| Cabinet lighting supply protection | max. 10 A |
| Standstill heater supply | 230 V / 50 Hz, 100 W (or 2 x 100 W for 800-1200 mm cabinets) |
| Standstill heater supply protection | max. 16 A |
| Default SMC30 encoder setting | HTL encoder, bipolar, 1024 pulses per revolution |
The power cables must be connected with a torque of 50 Nm.
Forming is required if the cabinet has been stationary for more than 2 years.
The load current may be a maximum of 10 A.
In the delivery state, an HTL encoder is set bipolar with 1024 pulses per revolution.