Oracle Agile PLM Recipe & Material Workspace Material Management Guide v9.3.1.2

User guide for Oracle Agile PLM Recipe & Material Workspace material management module, version 9.3.1.2.


Oracle Agile PLM Recipe & Material Workspace Material Management Guide v9.3.1.2 - cover page
Brand
Oracle
Document type
User Manual
Language
English
Pages
56
File format
PDF
File size
597 KB
Published
29 September, 2026
Updated
29 September, 2026
MD5 checksum
2081307295A37EB0E1EF89C36C2AD850

About this manual

This guide explains how to use the Material Management module of Oracle Agile PLM Recipe & Material Workspace. It covers creating and managing materials, lots, containers, inventory, requests, allocations, dispensing, staging, and analytical activities such as assays and stability studies.

The document includes step‑by‑step procedures for adding materials, setting stock levels, changing lifecycle phases, handling material orders, adjusting inventory, and managing analytical data. It also describes new features for version 9.3.1.2 and provides references to related Oracle PLM documentation.

What's inside

  • Introduction to Material Management
  • Working with Material
  • Material Inventory Management
  • Material Requests and Allocation
  • Analytical Activities and Assays
  • Specification Plans
  • Stability Study Support
  • Lot Release Process
  • What’s New in v9.3.1.2
  • Document Navigation and Support

Specifications

Part NumberE23874-01

Frequently asked questions

What new features were added in version 9.3.1.2?

No new features were added to RMW Material Management in PLM Release 9.3.1.2.

How can you add a new material to the Material Library?

Select the appropriate menu, enter the material details, and save the entry as described in the 'Adding Material to the Material Library' section.

Download PDF (597 KB)

More Oracle Manuals


View all Oracle manuals →