Kohler Skyline K-81016T-FM-SHP Shower Enclosure Installation Guide

Installation guide for Kohler Skyline K-81016T-FM-SHP pivot shower enclosure with 8mm tempered glass, including tools, steps, and safety warnings.


Kohler Skyline K-81016T-FM-SHP Shower Enclosure Installation Guide - cover page
Brand
Kohler
Document type
Installation Guide
Language
Chinese
Pages
4
File format
PDF
File size
2.5 MB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
95367A5E650D3AF81F1DD9DD10A49BC7

About this manual

This document provides step-by-step instructions for installing the Kohler Skyline K-81016T-FM-SHP pivot shower enclosure. It covers preparation, tool requirements, wall mounting, glass installation, and sealing. Safety warnings emphasize handling tempered glass carefully to avoid injury. The enclosure must be installed on a flat, vertical wall with proper waterproofing and no electrical outlets nearby.

The guide includes exploded diagrams, part lists, and specific measurements. It requires tools like Allen keys, a drill, level, and silicone gun. Installation must be completed within 24 hours before use, and the tray must be level. Wall jamb verticality is critical, with a recommended tolerance of ±3mm/m. This manual is written in Chinese.

What's inside

  • Installation Steps
  • Tools Required
  • Safety Warnings
  • Wall Preparation
  • Glass Installation
  • Sealing and Finishing

Specifications

Glass Thickness8mm
Product StandardQB 2584-2007
Wall Verticality Tolerance±3mm/m
Tray Level RequirementLevel along front edge

Frequently asked questions

What tools are required for installing this shower enclosure?

Tools include 5mm and 2.5mm Allen keys, masonry drill with 6mm bit, pencil, level, measuring tape, Phillips screwdriver, hammer, knife, caulking gun, and safety goggles.

How long should I wait before using the shower after installation?

Do not use the enclosure for at least 24 hours after installation.

What is the wall verticality tolerance for this installation?

The wall must be vertical with a recommended tolerance of ±3mm/m; exceeding this may void warranty.

Can tempered glass be drilled or cut during installation?

No, tempered glass cannot be drilled, cut, or struck with hard objects; doing so risks injury or damage.

Download PDF (2.5 MB)

More Kohler Manuals


View all Kohler manuals →