Kohler EZT715-EZT750 engine service manual covering safety, maintenance schedule, specifications, EFI system, troubleshooting, disassembly and reassembly.
This is the Kohler service manual, document 16 690 12 Revision B, for EZT715, EZT725, EZT740 and EZT750 engines. It begins with safety precautions, the periodic maintenance schedule and oil and fuel recommendations, then presents engine dimensions and specifications, tools and auxiliary supplies, and troubleshooting.
The remaining sections cover the air cleaner/intake, the electronic fuel injection (EFI) system, governor system, lubrication system, electrical system, starter system and emission compliance system, followed by disassembly/inspection and repair and reassembly. A storage procedure for engines left unused for more than two months is also included. This manual is written in Chinese.
| Bore | 83 mm (3.27 in.) |
|---|---|
| Stroke | 67 mm (2.64 in.) / 69 mm (2.72 in.) |
| Displacement | 725 cc (44 cu. in.) / 747 cc (46 cu. in.) |
| Oil capacity (refill) | 1.9 L (2.0 U.S. qt.) |
| Recommended oil | Kohler oil; API service grade SJ or higher |
| Fuel requirement | Clean, fresh unleaded gasoline, 87 (R+M)/2 pump octane or higher |
Clean, fresh unleaded gasoline with a pump octane rating of 87 (R+M)/2 or higher; gasoline blended with up to 10% ethanol and up to 15% MTBE is also approved.
The maintenance schedule lists changing the oil and filter every 100 hours, with more frequent service in dusty or dirty conditions.
1.9 L (2.0 U.S. qt.) when refilling.
Add Kohler PRO series fuel treatment to the fuel tank and run the engine 2-3 minutes, change the oil while the engine is still warm, disconnect the negative battery cable and store the engine in a clean, dry place.