Installation instructions for the Kohler 944T-4 recessed dual-handle lavatory faucet, including rough-in dimensions, operation, and assembly steps.
This document provides installation instructions for the Kohler 944T-4 Recessed Dual-Handle Lavatory Faucet. It includes rough-in dimensions, operation instructions, and a list of service parts with part numbers. Important notes regarding water pressure testing and local plumbing codes are provided before beginning the installation. This manual is written in Chinese.
| Test Pressure Limit | 0.8MPa (8 bar) |
|---|---|
| Test Duration Limit | 30 minutes |
| Supply Pipe Thread | G1/2˝ |
| Wall Distance | 50mm to 65mm |
Turn the left handle counter-clockwise to open and the right handle clockwise to open.
The test pressure must not exceed 0.8MPa (8 bar).
Connect the hot supply pipe to the end of the yoke with the red mark.