Installation guide for the Cisco NCS 4216 router, covering rack mounting, module installation, power connection, and initial setup procedures.
This document serves as the hardware installation guide for the Cisco NCS 4216 router. It provides detailed instructions on preparing the installation site, mounting the chassis in a rack, and installing various interface modules, power supplies, and fans.
The guide covers essential procedures such as connecting power cables, configuring the console interface, and performing initial hardware checks. It also includes safety warnings, environmental requirements, and troubleshooting steps for LED indicators and common hardware issues. This manual is written in Japanese.
| Power Input Voltage | -40.0V to -72VDC |
|---|---|
| Power Output Voltage | -48/-60VDC |
| Maximum Power Output | 900W |
| Wire Gauge for DC Input | Minimum 10AWG |
| Wire Gauge for Connector | Maximum 6AWG |
| Power Supply Redundancy | 2+1 Redundancy Mode |
Yes, the power supplies are hot-swappable because they are enclosed to prevent high voltage shock, so interlocks are not required for the power cables.
The power automatically shuts down when the unit is removed from the chassis.
At least two power supplies must be turned on for the chassis to operate normally.