Service Bulletin 623A provides inspection procedures for impulse coupling cam assemblies in Bendix magnetos to prevent failure due to improper heat treatment.
This service bulletin addresses the potential failure of impulse coupling cam assemblies in various Bendix magneto models. It alerts users to the risk of improperly heat-treated (soft) flyweights and provides a specific inspection procedure to identify and replace defective components.
The document outlines compliance requirements for magnetos with less than 300 operating hours and spare parts, detailing the physical inspection process using a file to test flyweight hardness and the subsequent marking of compliant units.
| Castellated nut torque | 15 ft. lbs. (max 25 ft. lbs.) |
|---|---|
| Man hours required (shallow flange mag) | 1.0 hour per engine |
| Man hours required (deep flange mag) | 1.25 hours per engine |
Pass a fine #1, double cut, 1/2 inch wide file across the heel of the flyweight; if material is removed, the flyweight is soft.
Stamp a 1/16 inch letter "F" in the upper right corner of the identification plate.
Magnetos with less than 300 operating hours must be inspected and identified before the next engine start.