Bendix D-2000/D-2200 Series Magnetos Service Bulletin

This service bulletin outlines inspection procedures for housing distortion, installation of coil retention and cover sealing kits, and return procedures…


Bendix D-2000/D-2200 Series Magnetos Service Bulletin - cover page
Brand
bendix
Category
Other
Document type
Service Manual
Language
English
Pages
15
File format
PDF
File size
777 KB
Published
13 October, 2026
Updated
13 October, 2026
MD5 checksum
1771A9C5F2E5BA17085C6772BCA36A59

About this manual

This document serves as a technical service bulletin for Bendix D-2000 and D-2200 Series Magnetos. It addresses potential housing distortion caused by the tightening of center cover screws and provides instructions for correcting this issue using specific kits, such as the Bendix P/N 10-382939 Coil Retention Kit and P/N 10-682007 Cover Sealing Kit. The bulletin details how to identify equipment compliance categories and the necessary steps to achieve full compliance.

What's inside

  • Compliance
  • Housing Distortion Check
  • Installation of Coil Securing Kit
  • Installation of Cover Sealing Kit
  • Identification After Compliance
  • Procedure for Return
  • Maintenance Spare Parts

Frequently asked questions

What is the time compliance for this service bulletin?

Compliance is required at the first opportunity, but in any case no later than 100 operating hours after receipt of this Service Bulletin.

How can a Category 1 magneto system be identified?

A Category 1 system is identified by the presence of four "POP" rivets in place of the four center screws in the magneto/harness cover and the letter "D" stamped on the bottom line of the nameplate.

When must a magneto be returned to the factory for repair?

A magneto must be returned to the factory if it exceeds the specified limits of housing distortion, specifically if more than 0.008 inch feeler gage stock can be inserted between the block corners and the gage plate.

Download PDF (777 KB)

More bendix Manuals


View all bendix manuals →