IBM Tivoli Workload Scheduler is a powerful workload scheduler that can help businesses manage and optimize their IT resources. The software can help businesses improve productivity, reduce costs, and increase compliance.
This is the French edition of the IBM Tivoli Workload Scheduler User Guide and Reference for version 9.2.0 (program number 5698-WSH). It explains the basic concepts of the product: database objects, the Tivoli Workload Scheduler network, configuring the runtime environment, defining scheduling activities, and controlling job and job stream processing. It also covers production plan management, workload service assurance, variable tables, and event-driven workload automation.
The guide then documents how to define objects in the database and how to manage them with the composer command-line program, how to manage workload applications, and how to work with objects in the plan using conman and its commands. Later chapters cover dynamic scheduling functions and the utility commands, and the book ends with remarks, a figures list, and a tables list. Publication reference SC32-1274-15. This manual is written in French.
| Product version | 9.2.0 |
|---|---|
| Program number | 5698-WSH |
| IPv6 support | Supported (Internet Protocol version 6) |
It applies to version 9.2.0 of Tivoli Workload Scheduler, program number 5698-WSH.
Objects in the database are managed with the composer command-line program, which is described in its own chapter with its commands and return codes.
Yes, the document includes a section on IPv6 (Internet Protocol version 6) support.
Workload can be automated through event rules; the guide describes the event rule management process, the interfaces involved, and how to define event rules.