This document is about the pentair 5800 SXT downflow/upflow service manual job specification sheet.
This manual provides service and installation instructions for the Fleck 5800 SXT water softener control valve, which operates in both downflow and upflow modes. It details the job specification sheet requirements, including meter size, system type, and control program settings necessary for proper configuration.
| Operating Water Pressure | Minimum 20 psi (1.4 bar) |
|---|---|
| Electrical Supply | 120 VAC / 12 VDC |
| Maximum Water Pressure | 125 psi (8.6 bar) |
| Maximum Water Temperature | 110°F (43°C) |
| Freezing Protection | Do not drop below 32°F (0°C) |
| Maximum Operating Temperature | 125°F (52°C) |
A minimum of 20 psi (1.4 bar) of water pressure is required for the regeneration valve to operate effectively.
Press and hold the Extra Cycle button for five seconds to trigger an immediate regeneration.
Do not use granulated or rock salt; the manual specifies standard salt for the brine tank.
The controller may lose the time setting, requiring the user to re-enter the time when power is restored.