Centurion D10 and D10 Turbo Industrial Sliding Gate Operator Installation Manual

D10 and D10 Turbo Industrial Sliding Gate Operator User Manual.


Centurion D10 and D10 Turbo Industrial Sliding Gate Operator Installation Manual - cover page
Brand
Centurion
Category
Automation control Equipment
Document type
Other
Language
English
Pages
72
File format
PDF
File size
8.9 MB
Published
10 November, 2023
Updated
10 November, 2023
Models
D10, D10 Turbo
MD5 checksum
88F598B55FC24DF4FF1E1DF62FC11C62

About this manual

This is the Centurion Systems installation manual for the D10 and D10 Turbo industrial sliding gate operators. It covers safety instructions, specifications, site preparation, mechanical installation, electrical setup, wiring diagrams, commissioning, controller menus, diagnostics, manual operation and handover.

The text states that the D10 is a heavy duty operator for industrial sliding gates weighing up to 1000 kg, while the D10 Turbo is suited to lighter gates with high daily operation counts and is not recommended for gates over 240 kg. It also describes an opto-electronic travel limit system using an origin magnet and rotary encoder.

What's inside

  • Important Safety Instructions
  • General Description
  • Specifications
  • Required Tools and Equipment
  • Cabling Requirements
  • Operator Installation
  • Electrical Setup
  • Commissioning the System
  • Controller Features
  • Manual Operation

Specifications

Input voltage220V AC ±10%, 50Hz
Motor voltage24V DC
Battery charger2A @ 27.5V
D10 maximum gate mass1000 kg
D10 Turbo recommended maximum gate mass240 kg
Manual overrideLockable lever with key release

Frequently asked questions

What is the D10 designed to open?

The D10 is designed to open and close industrial sliding gates weighing up to 1000 kg.

What gate mass is recommended for the D10 Turbo?

The D10 Turbo is not recommended for gates weighing more than 240 kg.

How are gate travel limits managed?

Gate travel limits are managed by an opto-electronic system using a gate-mounted origin magnet and an internal rotary encoder.

What should be done before work on the system?

Before any work on the system, cut electrical power to the operator and disconnect the batteries.

Download PDF (8.9 MB)

More Centurion Manuals


View all Centurion manuals →