Centurion CP72SR5D3/D5/A5 Sliding Gate Automation Installation Manual

This is an installation manual for sliding gate automation, which includes information about the major components, installation process, and precautions.


Centurion CP72SR5D3/D5/A5 Sliding Gate Automation Installation Manual - cover page
Brand
Centurion
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
36
File format
PDF
File size
1.4 MB
Published
24 February, 2023
Updated
27 September, 2023
MD5 checksum
0051C1813F0EDF95F179912953C67EDB

About this manual

This document serves as the installation manual for the Centurion CP72SR5D3, D5, and A5 sliding gate automation systems. It details the major components, including the controller, motor, battery, and gear box, and specifies oil requirements for the gearbox. The guide provides mechanical mounting details for both concrete plinth options and includes a table of gate masses and load limits.

What's inside

  • Major Components
  • Mechanical Mounting
  • Cable Requirements
  • Duty Cycle Curves
  • Programming Controller
  • Fault Finders Guide

Specifications

Motor Voltage (D3/D5)12V DC
Motor Voltage (A5)220V AC
Battery Voltage12V DC
Gate Mass (D3)25 kg
Gate Mass (D5)60 kg
Gate Mass (A5)60 kg
Motor Fuse Rating16/20A slow blow 5x20mm

Frequently asked questions

What oil specification is required for the D5/A5 gearbox?

The gearbox requires Grade 75W90 oil, with a quantity of 75ml.

What is the minimum cable thickness for the mains supply?

The minimum cable thickness required for the mains supply is 0.5mm².

Download PDF (1.4 MB)

More Centurion Manuals


View all Centurion manuals →