This document is an installation manual for Centurion Systems products. It introduces the safety instructions, product specifications, installation steps, etc.
The document serves as a comprehensive guide for installing the Centurion LINEAR Swing Gate Operator Vector2. It begins with important safety instructions and general considerations regarding site preparation, pillar strength, and gate bracket positioning.
The manual details the step-by-step process for both inward and outward swing configurations, including determining the gate swing angle and allowable wind loads. It covers electrical setup, such as connecting wiring diagrams for various inputs like safety beams and loop detectors, setting limits on the controller, and configuring additional features via the menu.
All installation, repair, and service work must be carried out by a suitably qualified person.
You must cut electrical power to the operator and disconnect the batteries.
The mains power supply must be fitted with an all-pole switch with a contact opening distance of 3mm or greater.