Tyco Electronics DRK-3P-400-D100 3 Phase Direct Connected kWh Meter Installation Guide

This document is an installation guide that introduces the wiring of the DRK-3P-400-D100 model 3 phase direct connected 100 Amps kWh DIN rail meter.


Tyco Electronics DRK-3P-400-D100 3 Phase Direct Connected kWh Meter Installation Guide - cover page
Brand
Tyco Electronics
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
237 KB
Published
02 November, 2023
Updated
02 November, 2023
MD5 checksum
17F512F73E855219CA7CE5C69F2A2B4B

About this manual

This guide provides step-by-step instructions for installing the DRK-3P-400-D100 3-phase direct-connected kWh meter on a DIN rail. It covers electrical connections for 3- or 4-wire systems, LED indicators for power, metering, and connection errors, and operational controls. Safety precautions require qualified personnel and power disconnection before installation. The meter displays total and partial energy readings with selectable backlight and resolution modes.

The device features galvanic isolation between voltage and current terminals, an opto-isolated pulsed output, and compliance with CEI-EN standards. Connection errors trigger a yellow LED, and phase errors can be diagnosed using the 'Sel' key. The meter operates from 3x230V to 400V, supports 50/60Hz, and has a maximum current rating of 100A.

What's inside

  • Electrical Connections
  • Connection Errors
  • Operation
  • LED Indicators
  • Display and Backlight Control
  • Phase Error Diagnosis
  • Technical Specifications

Specifications

AccuracyClass 1 in accordance with CEI-EN 62053-21 standard
Operating Voltage3 x 230V L-N, 400V L-L (-15% / +10%)
Frequency50/60 Hz
Input CurrentIb = 10A
Maximum Current100A
Operating Temperature-10 °C to +45 °C
Relative Humidity10% at 90% non condensing
Connection TypeDirect for current conductors with galvanic isolation
Pulsed Output Voltage9-24Vdc ± 10%
Switchable Output Current20mA max
Display UnitLCD, 7 + 5 digit
Insulation Voltage4kV between output pulse and all other terminals
Housing ColorGrey RAL 7035
Protection LevelIP20/IP51 at the front

Frequently asked questions

What does the yellow LED indicate?

The yellow LED indicates a wrong connection. Check the installation for errors and refer to the 'Connection Errors' section.

How do I reset the partial energy reading?

To reset the partial energy reading, select the partial reading only and press and hold the 'Sel' key for more than 4 seconds.

What is the maximum current rating of the meter?

The maximum current rating is 100A.

What is the operating temperature range?

The operating temperature range is -10 °C to +45 °C.

Download PDF (237 KB)

More Tyco Electronics Manuals


View all Tyco Electronics manuals →