This guide describes site preparation for the ABI PRISM 310 Genetic Analyzer.
This guide provides step-by-step instructions for preparing your laboratory site before installing the ABI PRISM 310 Genetic Analyzer. It covers personnel assignment, space and environmental requirements, electrical and computer setup, safety protocols, and material handling. The guide also includes checklists for verification and installation procedures to ensure safe and proper setup.
Safety is emphasized throughout, with specific sections on chemical, electrical, biological, and laser hazards. The document references the user guide for operating procedures and directs users to Applied Biosystems’ support website for additional resources and training.
It is intended for personnel who schedule, manage, and perform tasks required to prepare the site for installation.